Sign In | Join Free | My chinacsw.com |
|
Brand Name : FASEC
Model Number : CB100(321-Type)&HD200
Certification : ISO9001:2008, SGS, etc.
Place of Origin : Zhejiang, China
MOQ : 1 pcs
Price : USD1000~USD1200 per ton
Payment Terms : L/C,T/T
Supply Ability : 600,000 tons per Year
Delivery Time : Based on client's needs
Packaging Details : Seaworthy packings into container or bulk vessel
Material : Q345B steel
Surface treatment : Painted or hot dip.etc
Size : According to client's need
Installation : Lifted into place by hand without crane, easier construction.etc
Multi-use : civil engineering construction projects and to provide temporary crossings for foot & vehicle traffic.
Carry capacity : Resist strong wind and earthquake, bears heavy snow.etc
Grade : Q345B-Q460C
Color : Army blue, light gray, hot galvanized or customized.etc
Bolt-A-Bin, the innovative lightweight steel bridge abutment and retaining wall solution, consists of a strong, cellular, corrugated steel retaining wall into which a mass of local granular soil can be compacted, resulting in a permanent steel abutment. This eradicates the need for concrete-pouring, substantially reducing project costs on materials, installation and overall programme delivery.
Specification:
Product Name | Bolt-A-Bin bridge |
Width | 4.2m, 3.7m, 4m, 7.56m etc |
Maximum span | 81meter single span or 200m multi-span |
Bridge deck | Steel composit panel |
Steel grade | Q345B (equivalent to ASTM A572) or Q460B |
Loading capacity | 20ton, 40ton up to 120ton truck etc, |
Corrosion | Original painted or Hot dip galvanized |
The design is very simple. The ‘boxes’ of corrugated steel can be configured in a number of standard plan dimensions and heights to incorporate changes in elevation and support a variety of straight or curved installations for differing project applications. The unique design of the product, combined with the strength of the enclosed mass of earth, enables it to withstand ground movements without cracking or bulging, and ensures the weight of a bridge and its load can be carried safely.
Bolt-A-Bin abutments are also lightweight and quick and easy to assemble by hand on-site, delivering outstanding versatility, especially in remote locations, and minimising the impact of on-site works on the environment.
Benefits
Cost-effective - The use of local granular material saves costs in materials. Concrete-pouring is not required and this expedites the installation time. As a result, the overall project can benefit from significant cost-savings associated with materials, plant and labour.
Quick to supply and install - The abutments can be supplied quickly and are fast and easy to install. Unlike concrete which needs time to set, steel abutments can be assembled in a few days. A pre-assembled bridge can be launched immediately, meaning significantly less time is required on site.
Lightweight and easy to handle - The lightweight corrugated steel components can be assembled quickly by hand on site.
Strong - The combination of strong corrugated steel components and the compacted soil mass provides a sturdy, robust solution which can adjust to minor ground movement without cracking or bulging.
Durable - The standard galvanised coating provides many years of service.
Versatile - Available in 11 standard depths and numerous heights, the unique design can accommodate a wide range of both permanent and temporary applications.
Environmentally-friendly - The solution is 100% recyclable. Minimal on-site equipment and labour is required leading to a smaller and more controlled environmental impact. Temporary installations can be dismantled easily, and the casings can be safely recycled, whilst the granular fill is simply levelled.
![]() |
Bolt-A-Bin Overpass Footbridge Walkway Pedestrian Crossing Bridge Design Lightweight Images |